Key Achievements by Maaksons

 

CORPORATE 7

Corporate-7 is a project by Maaksons Engineering Corporation Ltd. It is the first project in Gulberg Greens with CDA NOC. The international corporate building in Islamabad complies with all safety standards and international codes. It has Luxurious reception areas, a smart building manage- ment system, a temperature-controlled double-height ground floor & corridors with elevators for independent accessibility. All luxurious facilities are being provided at only one platform, Corporate 7.

Duration:
June 2020 June 2021

Defence Raya Golf & Country Club

Construction Of Defence Raya Golf & Country Club (DRGCC) DHA Phase VI Lahore. was constructed by Maaksons Engineering Corporation Ltd in the tenure of two years. Defence Raya portrays remarkable building construction by Maaksons corporation that comprises foundation and basement with multi-level floors and boundary wall.

Duration: 2015-2017 Client: DHA Lahore

 

Garden Square

Garden Square Developers’ project in Eminabad is an economic housing scheme. The initiative has public benefit and is a first-of-its-kind private sector partnership to provide low income households with cutting-edge housing. Our main goal is to provide everyone with high-quality services at a reasonable cost of living.

As one of the largest economic projects in Pakistan’s history, the “Naya Pakistan Housing Scheme,” which is Prime Minister Imran Khan’s vision for affordable housing, is meant to be realized through the partnership.

I8 Interchange

I-8 Interchange, Islamabad

Construction of Interchange at I-8 Intersection, Islamabad including underground electrification and HT/LT removals and installation of transformers with complete Horticulture / Landscaping and Stromwater Drainage system (Phase-I).

Duration: 05 August, 2015 to 04 February, 2016 Client: Capital Development Authority (CDA), Islamabad.

 

US Embassy, Islamabad

A Project of the US Embassy to design & construct bomb proof Command & Control Building along-with offices and residences including Civil, Underground Electrical, Lighting Systems, and Mechanical Works.

Covered Area: 120,000 Sq Ft. Duration: January 2010 ~ 05 November 2010 Client: US Embassy, Islamabad

Signal Free Corridor – Walton Road

Construction of signal Free Corridor from Walton Road to Lalik Jan Chowk DHA Lahore, including one Flyover at Walton Road, one Underpass and one Flyover at PSO Chowk, one Underpass at Masjid Chowk, one Underpass at Ghazi chowk and Re-Modeling of Road at Lalik Jan Chowk. Development and construction of the complete road with rigid pavement as well as HT/LT removals in consent with LESCO, lighting, complete Horticulture / Landscaping, and Stormwater Drainage system.


Duration: November 02, 2017 to October 04, 20 Client: DHA Lahore

BRTS Project – Package Vlll

Constructed over a length of 04 km on either side with a 4-Lane on each side and grade-separated facility from Zero Point to Faizabad Interchange (Phase-I). Construction of an interchange at the I-8 Intersection in Islamabad is one of the remarkable projects, including underground electrification, HT/LT removals, and the installation of transformers, as well as a complete horticulture, landscaping, and storm water drainage system

Duration: June 30, 2015 to December 05, 2015 Capital Client: Development Authority (CDA)

Happy Clients

ARE YOU INTERESTED

IT'S TIME TO DISCOVER

your new office!

BUILDING LOCATION

ADDRESS:

Corporate 5, Executive Block 1, Civic Center, Gulberg Greens, Islamabad

Lahore address

98/9, Shakil Ali Lane, Babar Block, New Garden Town, Lahore

Islamabad Address

Corporate 7, Civic Center, Gulberg Greens, Islamabad

Phone:

+92-307-0000-017

E-mail:

maaksons.islamabad@maaksons.com

CONTACT AGENT

Ali Khan

CERTIFIED AGENT

ENQUIRE

    2024 © Corporate5. All rights reserved.